
Dhika Jhonda Pratama
About Candidate
accustomed to supervising MEP projects, working based on targets, coordinating with contractors, solving problems, reading as-built drawings.
Location
Education
Work & Experience
• Planning, design & supervise the MEP project for infrastructure, such as electrical utility, WTP, Fiber Optic. Check installation and opname result of MEP project • Conduct meetings to discuss the progress of the project results with the Project Manager
• Preparation for commissioning documents and will be responsible for GIS 275 KV System, transformer, and generator, 6 kV section, and 400 V PC section after commissioning • Prepare and arrange for electrical operation procedure, ticket (GIS 275 KV, transformer and generator, 6 KV section, 400 V PC section, DC power, UPS system) and PTW document. • Preparation for backfeeding (Rack in/ rack out CB 6 kV / Standby section, and 400 V PC section). • Verify the system’s performance, including establishing acceptance criteria, obtaining completed reports, performing verification and spot checking for GIS 275 kV system, transformer, and Generator, 6 kV section and 400 V PC section. • Conduct commissioning coordination meetings required for pre-commissioning and commissioning on electrical system. • Advance safety knowledge by conducting the electrical safety Operation Training and Operation Ticket training. • Prepare and arrange to monitoring operation of exciter before and after connect to grid (documents)
• Control of Electricity Consumption. • Operation of Low-voltage Grids of 380 V and 220 V. • Operation of Measuring And Limiting Devices.